Major Milestones

At Rawabi, people knowledge and passion are put into action. Together, we can make the next milestone.

  • 1984 Company Established and construction work commence
  • 1985 1st Power system delivered SEC East, and Saudi Aramco
  • 1988 Production facility increased to 5000 m2
  • 1989 1st Process Quality System established
    • 1st Control system delivered
  • 1992 Key SEC vendor for unit and packaged substations
    • 1st Control Panel with Purging System delivered to Saudi Aramco
    • 1st 10,000 Amps Synchronizing System
  • 1993 Production area increased to 10,000 m2
    • 1st Vibration and Temperature Monitoring System delivered to Saudi Aramco
  • 1994 1st delivery of Classified Area (NEMA7) Switchrack
  • 1995 Rawabi is accredited for ISO 9002: 1994 by KEMA (Netherlands)
  • 1996 1st Walk-In Medium Voltage Switchgear Station
  • 1997 1st Sound Attenuated Generator Enclosure
  • 1998 1st ESD Triple Redundant System delivered to Saudi Aramco
  • 2000 1st Portable Power Center delivered in association with Siemens
  • 2001 1st Passive Cooling Shelter for Telecom.
  • 2002 1st RTU solution is delivered, in association with Siemens and Bristol Babcock (Emerson Electric)
    • 1st SCADA and ESD system delivered, in association with Yokogawa
  • 2004 Induction of High Precision CNC Metal Processing Machineries
  • 2005 Classified Area Switchracks equipped with Fail-Safe MTS.
  • 2006 1st of its kind double redundant interlock system, for deferent power source.
  • 2007 Deliver the 1st Mega Process control (locally built, staged, and IFAT for the 1st time in Middle East), to Saudi Aramco Khurais Project, in association with Emerson Electric
  • Official partnership with European Cubic, to deliver their leading IEC and UL modular system solutions
  • 2008 World leader in Switchracks, with over 1200 units delivered for both Classified and non Classified Areas
  • Official Partnership with Canadian Dynamysk Automation to supply high end Process Control on MAC basis.
  • 2009 Production area increased to 17,500 m2
    • Official Partnership with Canadian Dynamysk Automation to deliver high end process systems
    • 1st Petrochemical Process Control system completed on PMC basis, at Sipchem, Jubail.
    • Induction of Eight stages Zink Phosphate Powder coating system
  • 2010 Introducing IMS (ISO 9001 : 2008 and OHSAS 18001)