Major Milestones
At Rawabi, people knowledge and passion are put into
action. Together, we can make the next milestone.
- 1984 Company Established and construction work
commence
- 1985 1st Power system delivered SEC East, and Saudi Aramco
- 1988 Production facility increased to 5000 m2
- 1989 1st Process Quality System established
- 1st Control system delivered
- 1992 Key SEC vendor for unit and packaged substations
- 1st Control Panel with Purging System delivered to Saudi Aramco
- 1st 10,000 Amps Synchronizing System
- 1993 Production area increased to 10,000 m2
- 1st Vibration and Temperature Monitoring System delivered to Saudi
Aramco
- 1994 1st delivery of Classified Area (NEMA7) Switchrack
- 1995 Rawabi is accredited for ISO 9002: 1994 by KEMA (Netherlands)
- 1996 1st Walk-In Medium Voltage Switchgear Station
- 1997 1st Sound Attenuated Generator Enclosure
- 1998 1st ESD Triple Redundant System delivered to Saudi Aramco
- 2000 1st Portable Power Center delivered in association with Siemens
- 2001 1st Passive Cooling Shelter for Telecom.
- 2002 1st RTU solution is delivered, in association with Siemens and
Bristol Babcock (Emerson Electric)
- 1st SCADA and ESD system delivered, in association with Yokogawa
- 2004 Induction of High Precision CNC Metal Processing Machineries
- 2005 Classified Area Switchracks equipped with Fail-Safe MTS.
- 2006 1st of its kind double redundant interlock system, for deferent
power source.
- 2007 Deliver the 1st Mega Process control (locally built, staged, and
IFAT for the 1st time in Middle East), to Saudi Aramco Khurais Project,
in association with Emerson Electric
- Official partnership with European Cubic, to deliver their leading IEC
and UL modular system solutions
- 2008 World leader in Switchracks, with over 1200 units delivered for
both Classified and non Classified Areas
- Official Partnership with Canadian Dynamysk Automation to supply high
end Process Control on MAC basis.
- 2009 Production area increased to 17,500 m2
- Official Partnership with Canadian Dynamysk Automation to deliver high
end process systems
- 1st Petrochemical Process Control system completed on PMC basis, at
Sipchem, Jubail.
- Induction of Eight stages Zink Phosphate Powder coating system
- 2010 Introducing IMS (ISO 9001 : 2008 and OHSAS 18001)
|